Two ATT Nautica fitters laying teak panels on the side deck of a Rossinavi 46 under scaffolding

Services

Teak deck installation

Our team installs the panels we build, or supplies them for your yard to fit.

Fitted by our team
or supplied for yours
Across Europe

Book an installation slot →

01

Where we install

We install in Croatia, Slovenia, Italy, France and Greece, and anywhere else in Europe. We can build the panels and ship them, or come to the vessel and fit them ourselves. The panels are built and finished in Zagreb, so what travels to the boat is a set of finished panels and a fitting team, not a workshop.

That matters more than it sounds. A deck caulked and sanded in controlled conditions does not depend on the weather at the yard, and the work on board becomes bonding, trimming and final detail rather than weeks of dust over an open boat.

If your vessel lies further afield, we still supply. A yard anywhere can fit our panels to the bonding specification that ships with them. That is what the prefabricated route is for.

Head office

Zvonigradska 43b, 10000 Zagreb

Quotes, drawings, accounts

Production

Kovinska 11, 10000 Zagreb

Workshop: panels are built and finished here

02

The installation process

Surface preparation and moisture check

The substrate is ground back to sound material and checked for moisture before anything is bonded. Bonding onto a wet or contaminated deck is the most common reason a new deck fails early. If the reading is wrong we stop and dry it rather than work around it.

Bonding the panels

Panels are dry-fitted first, then bonded down under weight so the adhesive bed is even across the whole panel. We bond with a two-part marine epoxy or an MS polymer, depending on how the deck is fitted and the conditions on board. Where a deck is bonded rather than screwed, nothing is fastened through the planks that can leak later.

Caulking and final sanding

Seams are caulked with TDS or Zetamarine, in black, grey or white, left to cure, then sanded flat. On a prefabricated deck most of that is already done in the workshop. On board it is the joins, the margins and the final pass that make the deck read as one surface.

Sunreef 60 side deck during fitting, sander and extraction on the new teak
Prestige M48 foredeck just fitted, blue masking tape still on the margins

03

Our team, or your yard

AB 92 foredeck being laid in the shed, new teak panels going down beside the old deck

Both routes end with the same deck. The difference is who is standing on it, and what that does to the cost and the schedule.

Our team on board

We bring the fitting crew and the deck arrives as one job, with a single point of responsibility: if a panel does not sit, the people who made it are the people adjusting it. This is the usual choice for refits, for complex geometry, and for owners who would rather not coordinate two suppliers.

Your yard, our panels

You take delivery of finished panels and the bonding specification, and your own team fits them. Cheaper, and often faster, because no crew travels to you. It works where the yard has done bonded decking before and the substrate is already known to be sound.

04

What sets the time on board

Fitting time depends on the substrate, not on the teak. On a sound deck, bonding a prefabricated set is the short part of the job, because the caulking and the first sanding have already happened in the workshop.

A full replacement is a different job. Removal, substrate assessment and repair come first, and those are the parts that decide the schedule.

We plan the schedule with you at quote and revise it once, after the deck is open and we can see what is underneath. Any date given before that is a guess.

05

What we need from you before we start

  1. Vessel make, model and year.
  2. Deck area in square metres, or the drawings if you have them.
  3. Photographs of the current deck, including any soft or lifting areas.
  4. Where the vessel will be, and when it is out of the water.
  5. Whether your yard will fit the panels or you want our team on board.

Book an installation slot

Tell us the boat and what it needs. We quote per vessel, not from a price list.

Head office

Zvonigradska 43b

+385 91 732 7931

Production

Kovinska 11

+385 91 251 2900

Hands setting a curved teak margin plank into a deck

    We use your details only to answer this request. Privacy policy